Wakefield House
Previous Next South Australian Government were looking to replace the existing backup generator the building was first built with back in 1976. The scope of works included upgrading the generator size to a Pramac GSW415V open frame with the integration of a 200kW auto load bank for maintenance. The existing fuel system was upgraded with […]


